« New cake for christmas | Main | The Road »

December 15, 2007

French drain, basement floor, kitchen patched up

Bunch of stuff happened at the house this week. A french drain was put in outside the foundation, the basement floor is ready for pouring on Monday and the kitchen is nice and square.





Posted by Chris at December 15, 2007 01:37 PM